Auris at Nellis rendering

Auris Communities — SmartPlex Development LLC

Auris at Nellis

A 48-Unit 9% LIHTC Workforce Housing Community — Las Vegas, Nevada

Pending Site Control

Details

Project Overview

Location

4709 S Nellis Blvd, Las Vegas, NV 89121

APN

161-20-701-002

Total Units

48 Units

Unit Mix

2-Bedroom and 3-Bedroom Townhomes

AMI Targeting

50-60% Area Median Income

LIHTC Program

9% Competitive Allocation

Construction Type

Type V-B Wood Frame — 3 Stories

Certification

Zero Energy Ready Home (ZERH) — All Units

Smart Home

SmartRent IoT Platform — All Units

Site Area

2.35 Acres

Land Partner

Episcopal Diocese of Nevada — Ground Lease (Pending)

Adjacent Amenity

Ullom Elementary School — Directly Adjacent

Development Status

Pending Site Control — Pre-Development

Target Application

2027 NHD 9% LIHTC Cycle

Development Progress

Construction Milestones

Tracking the current stage of development for Auris at Nellis.

Location

The Site

Auris at Nellis is proposed for a 2.35-acre parcel on South Nellis Boulevard in the heart of Las Vegas — a high-traffic arterial corridor with direct bus service and walkable access to employment, services, and schools. The site sits directly adjacent to Ullom Elementary School, a brand new Clark County School District campus, making Auris at Nellis one of the most family-accessible workforce housing locations in the Las Vegas Valley.

2.35 Acres

Total Site Area

Adjacent

Ullom Elementary School

Partnership

A Faith-Based Community Partnership

Auris at Nellis is being developed in partnership with the Episcopal Diocese of Nevada, which has proposed contributing the 2.35-acre site via ground lease as part of a community-focused development agreement. The Episcopal Diocese of Nevada operates 28 churches across the state and has a deep commitment to economic justice and community uplift in the Las Vegas Valley.

This partnership brings several structural advantages to the project: a nonprofit Co-General Partner relationship that satisfies NHD LIHTC application requirements, a community anchor that strengthens the competitive LIHTC application scoring, and a land contribution structure that reduces acquisition costs and improves the overall capital stack.

A formal site walk is scheduled for August 2026 and partnership terms are actively being finalized. SmartPlex is targeting a 2027 NHD 9% LIHTC application cycle submission.

Partnership terms are currently under negotiation. Site control has not yet been secured. This page reflects the current status of active pre-development discussions.

Product

The Auris Communities Product

Every unit at Auris at Nellis will be built to the same standard as all Auris Communities developments — a market-rate product experience delivered at workforce rents.

Private Entrances

Every unit has its own front door. No shared hallways. No apartment-building feel.

Individual Backyards

Private outdoor space for every unit — a feature found almost nowhere in affordable housing.

Tuck-Under Parking

Ground-floor parking integrated into the structure. One space per unit, protected and accessible.

SmartRent IoT

Smart locks, leak detection, connected thermostats, and Nest AI thermostat standard in every unit.

ZERH Certified

Zero Energy Ready Home certification across all 48 units. Lower utility bills for residents.

Upward Mobility Initiative

Credit reporting, financial literacy, and a structured homebuyer pipeline built into every Auris community.

Resident Services

The Upward Mobility Initiative

Auris at Nellis will deliver the full SmartPlex Upward Mobility Initiative from day one — partnering with Pro Recovery Credit Repair, Americana Home Loans, Nevada Partners, and The Monarch Advisory Group to create a structured pathway from workforce rental housing to homeownership for every resident who is ready to take that step.

Learn More About the Initiative

Community

A Community Anchor

St. Matthew's Episcopal Church has served the South Nellis Boulevard corridor since 1989, offering English and Spanish-language services and active Hispanic ministry to the surrounding neighborhood. The Auris at Nellis development will build on that community foundation — serving the same working families that St. Matthew's has supported for decades, and delivering the Upward Mobility Initiative programming through the established community relationships the Diocese has built over more than 35 years.

Schedule

Indicative Development Timeline

Summer 2026

Active partnership discussions — Episcopal Diocese of Nevada

August 2026

Site walk with SmartPlex development team and architect

Q3 2026

Partnership terms finalized — ground lease executed

Q4 2026

Site control secured — architectural feasibility scope begins

Q1 2027

Rezone application filed — City of Las Vegas

May 2027

NHD 9% LIHTC application submission

Summer 2027

Award notification

Late 2027 / Early 2028

Construction close

2028–2029

Construction and lease-up

Interested in Auris at Nellis?

Accredited investors who have completed verification in the SmartPlex Member Access portal may express interest in Auris at Nellis. Investment details will be made available through the formal Private Placement Memorandum upon accreditation confirmation.

For Accredited Investors Only · Rule 506(c) Regulation D · SmartPlex Development LLC · This page does not constitute an offer to sell or solicitation of an offer to buy any securities.